Rough In Inspection
This inspection is required after all piping has been installed and before any piping has been covered or concealed or any appliances have been attached thereto.
Top Out Inspection
Inspection required after all piping above the floor to the extensions through the roof and/or walls have been completed and before any piping is covered or concealed.
Final Inspection
When all plumbing is complete, the fixtures are installed and ready for service a final inspection shall be requested.