This project is to replace the existing storm pipe and install three 36" culvert pipes to include concrete headwalls and rip-rap rock on the down stream section in the arroyo between Viga Rd. and 14th St. on 15th St. In addition, repaving the section of roadway after the pipe installation.
While project work is taking place, closures/detours will be in place along 15th St. S.E. between Viga Place and 14th St. S.E. (see map below).